. If a, b and c are 3 consecutive integers in that order, which of the following has the lowest value?
A. (a+b)/c
B. (b+c)/a
C. (a+b)/b
D. (c+b)/a
E. None
সঠিক উত্তরঃ
A.
(a+b)/c
Explanation:

Related Questions (Any University/Year)
- Francis had a average of 75 on her first four Geography tests, After taking the next test, her average dropped to 72. How much did she get in the fifth test?
- 36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work?
- Shuvo requested for an equal number of Math and English books. The delivery stuff mistakenly delivered 300 extra Math books, making the ratio 6:5. How many books did Shuvo originally order?
- A train left Dhaka for Chittagong at 62 km per hour and at the same time another train left Chittagong for Dhaka at 48 km per hour on the same route. How far apart were the two trains one hour before they met?
- Find the average of all whole numbers between 1 and 100 that end in 3.
- In an excel sheet, there are 5 rows and 5 columns where you can put either 5 or 10 . Suppose the number of 5 s in \(x^{th}\) row of the table is \(x-1\) for each row. What is the arithmetic mean of all the numbers in the table?
- If (a + b) > 0 and \(\sqrt{(a+b)}>b\), which of the following must be true?
- If x and y are integers and -6< x ≤ 7 and -3≤ y ≤ 9, then which of the following CANNOT be a value of xy?
- Tom and Bill agreed to race across a 50 foot pool and back again. They started together but Tom finished 10-ft ahead of Bill. If their rates were constant and Tom finished the race in 27 seconds, how long did Bill take to finish it?
- In a class, the average score of boys in an examination is 86 and that of girls is 81. If the average score of the whole class is 83, then what percent of the class are the girls?
- দুটি সংখ্যার গড় হচ্ছে 2x+1 , যদি একটি সংখ্যা x-2 হয়, হবে অন্য সংখ্যক কত?
- A can complete a project in 20 days and B can complete the same project in 30 days. If A and B start working on the project together and A quits 10 days before the project is completed, in how many days will the project be completed?
- The purchase price of an article is Tk. 48. In order to include 15% of cost for overhead and to provide Tk. 12 profit, the mark-up should be:
- If 16% of 40% of a number is 8, the number is :
- A And B can run 200m in 22 and 25 seconds respectively. How far is B from the finishing line when A reaches it?
- Bill can hammer 20 nails in 6 minutes. Jeff can do the same job in only 5 minutes. How long will it take them to finish if Bill hammers the first 5 nails, then Jeff hammers for 3 minutes then Bill finishes the job?
- ৫ জন পুরুষ বা ৮ জন স্ত্রীলোক একটি কাজ ১৪ দিনে শেষ করতে পারলে ১০ জন পুরুষ ও ১২ জন স্ত্রীলোক একরে কত দিনে কাজটি শেষ করতে পারবে ?
- A student multiplied a number by 3/5 instead of 5/3 , What is the percentage error in the calculation?
- Rabib has x more marbles than Rafi has. Together they have y marbles.Which of the following represents the number of marbles that Rafi has?
- A rope , x feet long, is cut into two pieces such that the length of one piece is 1 foot more than twice the length of the other piece. Which of the following is the length, in feet, of the larger piece?